Notice on Estimated Requirements: Specific fields marked Estimated are inferred estimates derived from standard procurement guidelines where portal data was omitted. The official tender document is authoritative; please verify all criteria prior to bidding.
Key Requirements
Tender Fee
NilEstimated
Not stated on the portal (check the tender document): Minimum Turnover, Minimum Net Worth, Minimum Experience, Required Certifications, EMD, Pre-bid Meeting, Work Completion, Bid Opening.
Full Details
Organization
Ministry of Defence
Department
Department of Defence
State
All India
Category
WORKS
Tender Type
RFQ
Published Date
24 Sept 2026
Submission Deadline
16 Nov 2026, 09:00 am IST
Tender Fee
NilEstimated
Reference Number
GEM/2026/B/8022837
Source Portal
GeM
Not stated on the portal (check the tender document): Organization Type, District, City, Estimated Value.
Description
BATTERY LEAD VE,BATTERY LEAD VE,DASHBOARD CLUSTER AX130 SOIL BS 4,IGNITION STARTER SWITCH,STARTER MOTOR 4 2 KW,CHARGING ALTERNATOR 200395101207,SENSOR COOLANT E007701307D91 74HP M M,TURBO CHARGER TIER4 FINAL 120HP 006025855D91 200395101478,EGR VALVE ASSY BUTTERFLY 006023733C91,GASKET COVER INJECTION PUMP GEAR 006000099F,BOOST PRESSURE SENSOR 60000010184,AIR MASS SENSOR 006039463H01,GASKET LUB OIL OUTLET,PRE FUEL FILTER 200395101770 180505762050,INJECTOR 74 110 HP 006023436DI AX124 AAD95,FAN BELT 000020325E05 74HP M M,LUB OIL FILTER,PHASE SENSOR,WIRING HARNESS ASSY,STARTER PUSH SWITCH,MC BRAKE SWITCH 200174400600,SWITCH FOR HAZARIODS,FAN SWITCH,SWITCH FOR WIPER,SWITCH FOR FRONT CNOPY LIGHT,SWITCH FOR REAR WORK LIGHT,SWITCH FOR 4WD,SWITCH FOR KPC LOCK,PUMP SUCTION HOSE,O RING LOCKTITE 577 TAFLON TAPE FUSE KIT FOR BACKHOE LOADER,SINGLE KNOB SWITCH,ACEELERATOR PEDAL SENSOR,PUMP HIGH PRESSURE 200395101754,COMMON RAIL ASSY 200395101768,HARNESS ENGINE 200393449500,ELECTRONIC CONTROL UNIT ECU MD1CS162 M 301196400484
Corrigenda / amendments
No amendment details recorded so far.
We compare the bid deadline, opening date, value, EMD and document list each time we re-check the portal. The portal and its documents are the final authority, so confirm there before you bid.
My notes Private
Keep your own notes on this tender: site visit points, who is preparing the bid, what to ask at the pre-bid meeting. Only you can see them.